Review modifications, with significant hazard implications, made during the commissioning and start-up and check that the engineering line diagrams (ELDs), plant documentation and operating instructions have been updated
Review operation of the trip and alarm systems in terms of demand rates, spurious trips, trip defeats, interlock problems, and problems with testing
Occupational health: review results of monitoring, exposure of operators, and frequency of leaks and spillages, are all in line with assumptions made for the Basis for Safe Operation